Recent Posts

The Long History of a Brand New Building

The Long History of a Brand New Building

It took almost 20 years and required surviving two bond referendums, a recession, a few name changes and a pandemic. But, today, the new home of the NC State ISE Department stands tall.
Engineering Operations Virtual Reunion

Engineering Operations Virtual Reunion

My name is Ed White (BSEO ‘78) and I, along with ISE Department Head Julie Swann, would like to personally invite you to join us for the Engineering Operations Virtual Reunion.
Open the Doors | Fitts-Woolard Hall | NC State ISE

Opening the Doors

The new Fitts-Woolard Hall has hit many milestones. You can now add to that list the ISE Department taking beneficial occupancy on July 24, 2020.
Fall / Winter 2018 inGear Magazine

The 2018 Fall / Winter inGear is HERE!

That’s right, the latest edition of inGear Magazine is HERE! Download your copy of inGear Magazine or pick up a copy in ISE’s main office....
inGear Magazine | Spring/Summer 2018

inGear Magazine is HERE!

That’s right! You can download a copy of inGear Magazine if you prefer. If you would like to have a printed copy of the magazine...